Our company has been active in the manufacturing of industrial heaters and temperature control systems for over 20 years. Today, Omak Isıtma Sistemleri AŞ has become the largest manufacturer in the Middle East, Balkans and in most of Europe regarding the electric blankets, industrial heaters and temperature control devices in terms of quality, capacity, manufacturing prowess and the device technologies in its R&D labs. It offers film heaters with smart temperature control, industrial grade patented barrel – IBC tank heaters, heating tapes, fuel filter heaters, satellite dish heaters etc to its wide customer base ranging from the defense industry to automotive, from food and chemical industry to heavy machine industry for various different requirements.  

Omak offered solutions to the aforementioned industry branches through more than 1000 different types of heaters. The solutions we offer are also supported by the design and software of the temperature control devices that control these heaters.  

The composite curing blankets, to which we reflected the above mentioned expertise and experience, offer effective solutions especially in terms of the repairs and production of the wind turbines for heating up the local areas.

Thanks to the specifically developed control card and software, a reliable curing can be made via two different measurement locations. Furthermore, based on the user requirement, a gradual heating for curing can be achieved over a wider period of time. 

Due to the flexible and homogenous nature of the film heaters that we manufacture, the surface to be cured is completely wrapped and the curing is carried out in a completely homogenous manner in the area that is needed to be cured. 

In order to provide ease on installation for the operators on the turbine, locks and fasteners and ring type connections are included. At the same time, due to its special insulation, the product achieves a fast heating without being affected.

Operations and Maintenance

Eawind completes periodic audit for GWO blade repair training

Published

on

Eawind, one of the first training providers to offer GWO blade repair training in Türkiye, has announced the successful completion of its periodic audit process.

According to the company’s statement, the training program, delivered under Global Wind Organisation (GWO) accreditation, aims to provide participants with a globally recognized qualification.

The company also expressed its appreciation to Dr. Duygu Hakan and the Bureau Veritas team for their professional approach and contributions throughout the audit process.

Continue Reading

Operations and Maintenance

We4Ce and CEWA Plus Expand Blade Root Repairs in Asia

Published

on

We4Ce, a Netherlands-based rotor blade engineering company, has signed a Memorandum of Understanding (MOU) with Thailand-based renewable energy developer CEWA Plus to scale on-site blade root bushing remanufacturing across Asia.

The agreement integrates We4Ce’s proprietary “Re-FIT” methodology and CNC Onsite’s mobile machining solutions with CEWA Plus’s on-site execution and quality control processes, forming a regional service network.

Serial orders are scheduled to begin in April 2026, with operations expanding across 12 countries including India, Sri Lanka, Thailand, and Vietnam.

A new approach to blade root maintenance

Blade root bushings are critical structural components connecting the blade root to the turbine hub. In certain blade constructions, material shrinkage or uneven distribution may lead to microcracks and reduced bonding strength over time.

The Re-FIT methodology enables precise removal and replacement of the damaged interface layer, restoring a factory-standard mechanical bond.

Compared to conventional repair methods involving blade transport or replacement, the on-site solution offers:

  • Up to 60% cost reduction
  • Lower CO₂ emissions
  • Reduced downtime

New monitoring system: GapMaster Intelligence

The MOU also includes the integration of “GapMaster Intelligence,” a monitoring system developed by CEWA Plus.

Using high-precision laser scanning, the system continuously monitors the bond between the blade root and the bushing. Any detected gap triggers an automated alert via SCADA, enabling a shift toward proactive, condition-based maintenance.

Regional expansion and training

Technical teams from Asia will undergo training in Denmark and the Netherlands, covering machining operations, the Re-FIT process, and structural restoration procedures.

Following initial deployment in Thailand, the partners are also targeting expansion into Brazil and the United States, while developing solutions for offshore wind applications.

Continue Reading

Operations and Maintenance

GE Vernova Secures 1.1 GW of U.S. Onshore Wind Repower Orders in 2025

Published

on

GE Vernova receives 1.1 GW of U.S. wind turbine repower orders, extending asset lifetimes, increasing output, and supporting domestic manufacturing.

GE Vernova’s Onshore Wind business has secured orders in 2025 to repower 1.1 gigawatts (GW) of onshore wind capacity in the United States. The projects are expected to reach commercial operation between 2026 and 2027.

The repowering initiatives will utilize nacelles and drivetrains manufactured at the company’s Pensacola, Florida facility, reinforcing domestic manufacturing activity and supply chain localization.

Extending Asset Life and Increasing Output

Repowering enables wind farm operators to upgrade existing assets by replacing key components such as nacelles and drivetrain systems, without developing entirely new sites. This approach increases annual energy production, improves reliability, and reduces long-term operations and maintenance costs.

As onshore wind fleets mature, repowering is emerging as a cost-effective strategy to extract additional value from established sites while avoiding permitting complexities and grid connection challenges.

A Growing Installed Base

GE Vernova’s Onshore Wind segment supports an installed base of approximately 59,000 turbines worldwide, representing nearly 120 GW of capacity. The company continues to expand its focus on lifecycle services and modernization solutions as part of its broader energy transition strategy.

Repowering as a Strategic Trend

Globally, repowering is becoming an increasingly important component of wind market development. By upgrading high-performing sites with modern equipment, operators can enhance output without expanding land use, while improving project economics and asset performance.

The 1.1 GW of repower orders secured in 2025 signals sustained demand for modernization solutions in the U.S. market and highlights the growing role of lifecycle optimization in mature wind fleets.